Title International Nuclear Instructor Development Project FY2009
-Reactor Plant Safety Course Autumn Course- Sponsored by MEXT
Date Nov. 9 - Dec. 4, 2009
Participants 10
Agenda Curriculum
Photo UTR-KINKI Reactor

Outline <Lecture-1.1>ConfigurationandFeaturesofReactorPlant
<Lecture-1.2>Configuration and Featuresof Reactor Plant
<Lecture-2>Safety Cultureof Nuclear Power Plant
<Lecture-3>Basic Conceptof NPP Safety
<Lecture-4>Guidelines for Safety Design Principleof Nuclear Power Plant
<Lecture-5>Process from Siting to Construction of Nuclear Power Plant
<Lecture-6>Application for Installation Permission of NPP
<Lecture-7>Quality Assurance
<Lecture-8>Sustaining of Energyand Meaning of FBR Fuel Cycle
<Lecture-9>Property of Reactor Coolant (Sodium)
<Lecture-10>Human Factorsin NPP Accidents
<Lecture-11>Nuclear Eventsin Japanese Nuclear Power Plants
<Lecture-12>Plant Operation Control for PWR
<Lecture-13>Safety Measures for Nuclear Power Plant
<Lecture-14>Safety Evaluation of Reactor Plants
<Lecture-15>Nuclear Plant Decommissioning Technology
<Lecture-16>Basic of Reactor Physics -Nuclear Fission Reaction and Reator Kinetics-
<Lecture-17>Seismic Design of Reactor Plant (incl.Discussion)
<Lecture-18>Japanese fitness Code for Reactor Plant Service
<Lecture-19>Emergency Preparedness and Response (incl.Discussion)
<Lecture-20>In-Service Inspection (ISI) Technology (incl.observation of ISI equipment)
<Lecture-21>Development of New Concept for Plant Safety Technology
<Practice-1>Safe Handling of Reactor Coolant (Sodium)
<Practice-2>Monju Operator Training Simulator (Orientation)
<Practice-3>Non- Destructive Testing (NDT) Technology (PT,RT,UT)
<Practice-4.1>General Description of the UTR- KINKI Reactor
<Practice-4.2>Reactor Operation and Reactivity Measurement
<Practice-4.3>Neutron Radiography
<SiteTour-1>Prototype Fast Breeder Reactor Monju
<SiteTour-2>Nuclear Emergency Response Operations Facility
<SiteTour-3>Fukui prefecture Environmental Radiation Researchand Monitoring Center
<SiteTour-4>Wakasa Wan Energy Research Center
<SiteTour-5>NPP Maintenance Training Center
<SiteTour-6>Ohi Power Station
<SiteTour-7>Fugen Decommissioning Engineering Center
<SiteTour-8>Mihama Power Station
<SiteTour-9>Nuclear Power Training Center
<SiteTour-10>Tsuruga Power Station
<Presentation/Discussion>Strategy and Challenge of Nuclear Energy Development in my Country
Report Report


Adobe Acrobat Reader is necessary to display the PDF file